Sewerage

Description

Sewerage (or sewage system) is the infrastructure that conveys sewage or surface runoff (stormwater, meltwater, rainwater) using sewers. It encompasses components such as receiving drains, manholes, pumping stations, storm overflows, and screening chambers of the combined sewer or sanitary sewer. Sewerage ends at the entry to a sewage treatment plant or at the point of discharge into the environment. It is the system of pipes, chambers, manholes or inspection chamber, etc. that conveys the sewage or storm water. In many cities, sewage (municipal wastewater or municipal sewage) is carried together with stormwater, in a combined sewer system, to a sewage treatment plant. In some urban areas, sewage is carried separately in sanitary sewers and runoff from streets is carried in storm drains. Access to these systems, for maintenance purposes, is typically through a manhole. During high precipitation periods a sewer system may experience a combined sewer overflow event or a sanitary sewer overflow event, which forces untreated sewage to flow directly to receiving waters. This can pose a serious threat to public health and the surrounding environment. The system of sewers is called sewerage or sewerage system in British English and sewage system or sewer system in American English

Short Description

  Sewerage & Irrigation Project
  Sl.     No Project Details Client Name / Location Type of Services Project Cost Project Status
    1 Preperation of Detail Project Report (DPR) for Sewerage Scheme for Jageshwar Dham Area, Jal Nigam Almora , Uttrakhand Jal Nigam Almora, Uttarakhand Sewerage 3.83 Cr. Complete
    2 Topographical Survey & Hydraulic Modelling Design of Sewerage Scheme for Zone-3, Jal Nigam Almora , Uttrakhand Jal Nigam Almora, Uttarakhand Sewerage 30 Cr. Complete
    3 Sewerage Design Network for SW, DI, & GI Pipeline in town (Mansa, Baretta, Sardulgarh, Bhikhi, Budhlada & Boha) at Mansa District in the state of Punjab. (Total Network- 120 km Approx). GDCL - Krishna JV Project Sewerage 70 Cr. Complete
    4 Sewerage Scheme Design & Topographical Survey (I & D ,SPS & MPS) for Rishikesh (Sewerage Network- 25km Approx.) Gannon Dunkerley & Co. Ltd Sewerage 42 Cr. Complete
    5 Consultancy Services for External Services for Proposed GH- 1B, B.T. Park , Sushant City Lucknow , U.P. (16.57 Acres ) (Sewerage, Strom Drainage, Water Supply , Internal Drainage & Recycling of Water) Ansal Properties & Infrastrucure Ltd. Sewerage 40 Cr. Complete
    6 Design of Proposed New sewer Network and approval of the same from client & rectification as per client observation, Preparation of final networking drawing along with L Section at the interval of every 30 mtr considering the house connection details of approx length of (89 KM) SHRI SATKIRAN ENTERPRISES Sewerage 126 Cr. Complete
    7 Design of Proposed New sewer Network survey, review, design and redesign of raw effluent collection & conveyance system for CETP, JAJMAU, KANPUR, Charu Engineering Consultants Sewerage 30.8 Cr. Complete
    8 Preparation of Detail Design of Sewerage Scheme (zone -1, Zone -2, Zone -3 ,Udham Sing Nagar, Jammu. (Total Network- 150 km Approx). ALPS Engineers Sewerage 155 Cr. Complete