Survey

Description

Survey research is often used to assess thoughts, opinions and feelings. Surveys can be specific and limited, or they can have more global, widespread goals. Psychologists and sociologists often use surveys to analyze behavior, while it is also used to meet the more pragmatic needs of the media, such as, in evaluating political candidates, public health officials, professional organizations, and advertising and marketing directors. Survey research has also been employed in various medical and surgical fields to gather information about healthcare personnel’s practice patterns and professional attitudes toward various clinical problems and diseases. Healthcare professionals that may be enrolled in survey studies include physicians, nurses and physical therapists, among others. A survey consists of a predetermined set of questions that is given to a sample. With a representative sample, that is, one that is representative of the larger population of interest, one can describe the attitudes of the population from which the sample was drawn. Further, one can compare the attitudes of different populations as well as look for changes in attitudes over time. A good sample selection is key as it allows one to generalize the findings from the sample to the population, which is the whole purpose of survey research. In addition to this, it is important to ensure that survey questions are not biased such as using suggestive words. This prevents inaccurate results in a survey.

Short Description

Topographical Survey

  Sl.    No Project Details Client Name / Location Survey Length approximately in km Project Cost Project Status
  1 Conducting of , Topographical Survey , Detail Project report& Hydraulic Design Network for Balrampur District Uttar Pradesh (Total Number of Village- 600 Nos.) Dara Engineering & Infrastructures Private limited 6750 1200 cr Approx. Complete
  2 Conducting of Topographical Survey , Detail Project report,& Hydraulic Design Network for Sambhal District Uttar Pradesh (Total Number of Village- 118 Nos.) NKG Infrastructure Limited 1770 240 cr Approx. Complete
  3 Conducting of Topographical Survey, Detail Project report & Hydraulic Design Network for Pilibhit District Uttar Pradesh (Total Number of Village- 135 Nos.) PNC Infratech Limited 2025 170 cr Approx. Complete
  4 Conducting of Topographical Survey , DPR & Hydraulic Design Network for Gorakhpur District Uttar Pradesh (Total Number of Village- 100 Nos.) NCC Ltd 950 230 cr Approx. Complete
  5 Conducting of Topographical Survey for Zone-5 , 6 & 7 at Meerut Nagar Nigam Area, Meerut City, Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 1450   Complete
  6 Conducting of Topographical Survey for 15 Nos. Villages new added in Mujjafar Nagar Municipalty at Mujjafar Nagar City, Uttar Pradesh Jal Nigam Mujjafar Nagar, Uttar Pradesh 550   Complete
  7 Conducting of Topographical Survey Detail Project report, & Hydraulic Design Network for Kasgunj District Uttar Pradesh (Total Number of Village- 65 Nos.) PNC Infratech Limited 975 170 cr Approx. Complete
  8 Conducting of Topographical Survey Detail Project report, & Hydraulic Design Network for Barabanki District Uttar Pradesh (Total Number of Village- 55 Nos.) PNC Infratech Limited 825 140 cr Approx. Complete
  9 Conducting of Topographical Survey ,Detail Project report, & Hydraulic Design Network for Bagpat, Ghaziabad & Gautam Budhh Nagar District Uttar Pradesh (Total Number of Village- 37 Nos.) LC infra projects Pvt Ltd 555 110 cr Approx. Complete
  10 Conducting of Topographical Survey, Detail Project report, & Hydraulic Design Network for Bijnor District Uttar Pradesh (Total Number of Village- 3 Nos.) Vindhya Telelinks Ltd. 225 7 cr Approx. Complete
  11 Conducting of Topographical Survey, Hydraulic Design Network for Kasgunj District Uttar Pradesh Total Length of Distribution (Network- 120 km (Approx.) Swastik Construction 120 90 cr Approx. Complete
  12 Conducting of Topographical Survey & Detail Project Report (DPR) of District Nainital, Uttarakhand (SVS & MVS) Under Jal Jivan Mission (JJM) - 135 Nos. Villages & 90 DPR Jal Sansthan, Naintal Uttarakhand 5400 2150 Cr. Approx. Complete
  13 Conducting of Topographical Survey & Detail Project Report (DPR) of Syura Barsimi Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) Jal Nigam Almora Uttarakhand 60 7.41 Cr. Complete
  14 Conducting of Topographical Survey & Detail Project Report (DPR) of Khatyari Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) Jal Nigam Almora Uttarakhand 165 22.76 Cr. Complete
  15 Conducting of Topographical Survey & Detail Project Report (DPR) of Bhagtola -Sakar Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) Jal Nigam Almora Uttarakhand 90 14.45 Cr. Complete
  16 Project: Detailed Topographical Survey & Project Report of Single Villages Water Supply Scheme for Dehradun, Uttarakhand . Under Jal Jivan Mission (JJM) (Total Number of Village- 55) Jal Sansthan Haridwar, Uttarakhand 825 per DPR Approx. 1 Cr. to 5 cr. Complete
  17 Conducting of Topographical Survey & Detail Project Report (DPR) of Ghansali Pumping Water Supply Scheme, Block Bhilanga, District Tehri , Uttarakhand. Under Externally Aided Projects (AEP) Jal Nigam Ghansali, Uttarakhand 210 19.61 Cr. Complete
  18 Conducting of Topographical Survey & Detail Project Report (DPR) of Chhoi Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 75 8.18 Cr. Complete
  19 Conducting of Detail Project Report (DPR) of Chorpani Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 65 6.40 Cr. Complete
  20 Conducting of Topographical Survey for Karhera Sewerage Scheme at Ghaziabad Nagar Nigam Area, Ghaziabad , Uttar Pradesh Jal Nigam Ghaziabad, Uttar Pradesh 185   Complete
  21 Conducting of Topographical Survey for Village Duhai, Mainapur & Guldhar Water Supply Scheme at Ghaziabad Nagar Nigam Area, Ghaziabad , Uttar Pradesh Jal Nigam Ghaziabad, Uttar Pradesh 27   Complete
  22 Conducting of Topographical Survey for Mawana Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 139   Complete
  23 Conducting of Topographical Survey for Agrawal Mandi Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 33   Complete
  24 Conducting of Topographical Survey for Kithore Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 70   Complete
  25 Conducting of Topographical Survey for Baghpat Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 180   Complete
  26 Conducting of Topographical Survey for Harra Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 44   Complete
  27 Conducting of Topographical Survey for Hastinapur Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 122   Complete
  28 Conducting of Topographical Survey for Karnawal Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 43   Complete
  29 Conducting of Topographical Survey for Khekra Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 147   Complete
  30 Conducting of Topographical Survey for Kharkhoda Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 34   Complete
  31 Conducting of Topographical Survey for Behshuma Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 44   Complete
  32 Conducting of Topographical Survey for PrikshitGrah Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 63   Complete
  33 Conducting of Topographical Survey for Phalauda Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 50   Complete
  34 Conducting of Topographical Survey for Baraut Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 330   Complete
  35 Conducting of Topographical Survey for Sardhana Water Supply Scheme Under Amrut at Meerut Jal Nigam , Uttar Pradesh Jal Nigam Meerut, Uttar Pradesh 122   Complete
  36 Conducting of Topographical Survey & Detail Project Report (DPR) of Bajunia Haldu Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 45 7.33 Cr. Complete
  37 Conducting of Topographical Survey & Detail Project Report (DPR) of Dhikuli Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 40 3.49 Cr. Complete
  38 Conducting of Topographical Survey & Detail Project Report (DPR) of Teda Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 15 1.96 Cr. Complete
  39 Conducting of Topographical Survey & Detail Project Report (DPR) of Bagar Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) Jal Nigam Ramnagar, Uttarakhand 75 12.43 Cr. Complete
  40 Conducting of Topographical Survey, Detail Project Report (DPR) of 27 Nos. Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) Project Implementation Unit AMRUT (Roorkee), Uttarakhand 270 39.50 Cr. Complete
  41 Conducting of Topographical Survey & Detail Project Report (DPR) of Sultanpur Majri Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) Pey Jal Nigam Haridwar, Uttarakhand 135 18.50 Cr. Complete
  42 Conducting of Topographical Survey & Detail Project Report (DPR) of Shaympur Naurangabad Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) Jal Sansthan Haridwar, Uttarakhand 135 25.65 Cr. Complete
  43 Conducting of Topographical Survey & Hydraulic Modelling Design of Water Distribution network, RWSS Jorhat . Assam (Distribution Network- 1724km (Approx.) (Approval by World Bank & PHED Guwhati) Gannon Dunkerley & Co. Ltd 1724 247 Cr. Complete
  44 Conducting of Topographical Survey & , Contour Survey for OHT, CWR, & UGT Pump House Location for Water Supply scheme at Up Under UPJN Loni City, Ghazibad Uttar Pradesh Total Length of Distiribution Network- 400 km (Approx.) Lahoty Buildcon limited 400 177 Cr. Under progress
  45 Conducting of Topographical Survey & Hydraulic Modelling Design of Water Distribution network and Topographic Survey (Distribution Network- 850 km (Approx.). Sn Envirotech Pvt Ltd 850 144 Cr. Complete
  46 Conducting of Topographical Survey & Designing of Distribution and rising main for our running projects in Bandiya, Kicha distt- Udham Singh and Mehuwala cluster water supply project in Dehradun.( Network- 450 km Approx). Tirupati Cement Products 450 234 Cr. Complete
  47 Conducting of Topographical Survey & , Contour Survey for WTP, Intake Well, OHT & UGT Pump House Location for Water Supply scheme at Up Under UPJN ,Mirzapur City,Uttar Pradesh Total Length of Distiribution Network- 220 km (Approx.)
Total Length of Clear Water Rising Main- 18.3 km (Approx.)
Total Length of Raw Water Rising Main- 2.5 km (Approx.)
Gannon Dunkerley & Co. Ltd 220 120 Cr. Complete
  48 Conducting of Topographical Survey & Detailed Project Report of Single Villages Water Supply Scheme for Begusarai , Bihar . (Total Number of DPR- 25 ) J.S INFRA & CONSTRUCTION CO. 375 per DPR Approx. 2 Cr. to 10cr. Complete
  49 Conducting of Topographical Survey &Detailed Project Report of Single Villages Water Supply Scheme for Chhapra, Purnia, & Patna Districs , Bihar . (Total Number of DPR- 70 ) TECHNO ENGICON SOLUTIONS PVT.LTD. 1050 per DPR Approx. 2 Cr. to 10cr. Complete
  50 Hydralic Design & Vetting (IIT Roorkee) for Distribution Network for Haldani Talli at Haldwani (Network- 30.6 km Approx). Kashmiri Lal Constructions Private Limited 31 5.4 Cr. Complete
  51 Conducting of Topographical Survey & Sewerage Design Network for SW, DI, & GI Pipeline in town (Mansa, Baretta, Sardulgarh, Bhikhi, Budhlada & Boha) at Mansa District in the state of Punjab. (Total Network- 120 km Approx). GDCL - Krishna JV Project 120 70 Cr. Complete
  52 Conducting of Topographical Survey & Sewerage Scheme Design for (I & D ,SPS & MPS) for Rishikesh (Sewerage Network- 25km Approx.) Gannon Dunkerley & Co. Ltd 25 42 Cr. Complete
  53 Conducting of Topographical Survey & Detail Design of Sewerage Scheme (zone -1, Zone -2, Zone -3 ,Udham Sing Nagar, Jammu. (Total Network- 150 km Approx). ALPS Engineers 150 155 Cr. Complete
  54 Preparation of Topographical Survey & House Hold Survey for Mirzapur Nagar Nigam Area, Aligrah City, Uttar Pradesh {Total House Hold Survey & GIS Mapping & GIS Mapping - 55000 Nos. approx.} Jal Nigam Mirzapur, Uttar Pradesh 250 65 Cr. Approx. Under progress
  55 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- /, at Saharanpur Nagar Nigam Area, Saharanpur City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 3000 Nos. approx.} Jal Nigam Saharanpur, Uttar Pradesh 26 25 Cr. Approx. Complete
  56 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 76, at Aligrah Nagar Nigam Area, Aligrah City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 7050 Nos. approx.} Jal Nigam Aligrah, Uttar Pradesh 122 35.31 Cr. Approx. Complete
  57 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 12, at Hathras Nagar Nigam Area, Hathras City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1500 Nos. approx.} Jal Nigam Hathras, Uttar Pradesh 15 10 Cr. Approx. Complete
  58 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 8, at Khurja Nagar Nigam Area, Khurja City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1800 Nos. approx.} Jal Nigam Khurja, Uttar Pradesh 28 10 Cr. Approx. Complete
  59 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 3, at Bulandshahre Nagar Nigam Area, Bulandshahre City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1850 Nos. approx.} Jal Nigam Bulandshahre, Uttar Pradesh 26 11 Cr. Approx. Complete
  60 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 4, at Rampur Nagar Nigam Area, Rampur City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 3000 Nos. approx.} Jal Nigam Rampur, Uttar Pradesh 30 18 Cr. Approx. Complete
  61 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 41 & 35, at Loni Nagar Nigam Area, Loni City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 5300 Nos. approx.} Jal Nigam Ghaziabad, Uttar Pradesh 75 22 Cr. Approx. Complete
  62 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 91, at Ghaziabad Nagar Nigam Area, Kavinagar , Uttar Pradesh {Total House Hold Survey & GIS Mapping - 2150 Nos. approx.} Jal Nigam Ghaziabad, Uttar Pradesh 36 17 Cr. Approx. Complete
  63 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 32, at Meerut Nagar Nigam Area, Meerut City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 2200 Nos. approx.} Jal Nigam Meerut, Uttar Pradesh 47 18 Cr. Approx. Complete
  64 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 30 at Mujjafar Nagar Nagar Nigam Area, Mujjafar Nagar City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1100 Nos. approx.} Jal Nigam Mujjafar Nagar, Uttar Pradesh 14 10 Cr. Approx. Complete
  65 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- 20, at Hapur Nagar Nigam Area, Hapur City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1600 Nos. approx.} Jal Nigam Hapur, Uttar Pradesh 16 15 Cr. Approx. Complete
  66 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- /, at Shamli Nagar Nigam Area, Shamli City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1100 Nos. approx.} Jal Nigam Shamli, Uttar Pradesh 16 11 Cr. Approx. Complete
  67 Preparation of Topographical Survey, GIS Mapping & House Hold Survey for Ward No.- /, at Baraut Nagar Nigam Area, Baraut City, Uttar Pradesh {Total House Hold Survey & GIS Mapping - 1500 Nos. approx.} Jal Nigam Baraut, Uttar Pradesh 24 14 Cr. Approx. Complete