Water supply is the provision of water by public utilities, commercial organizations, community endeavors or by individuals, usually via a system of pumps and pipes. Public water supply systems are crucial to properly functioning societies. These systems are what supply drinking water to populations around the globe Aspects of service quality include continuity of supply, water quality and water pressure. The institutional responsibility for water supply is arranged differently in different countries and regions (urban versus rural). It usually includes issues surrounding policy and regulation, service provision and standardization. The cost of supplying water consists, to a very large extent, of fixed costs (capital costs and personnel costs) and only to a small extent of variable costs that depend on the amount of water consumed (mainly energy and chemicals). Almost all service providers in the world charge tariffs to recover part of their costs. Water supply is a separate topic from irrigation, the practice and systems of water supply on a larger scale, for a wider variety of purposes, primarily agriculture.
Short Description
Water Supply Project |
||||||||
---|---|---|---|---|---|---|---|---|
Sl.No | Project Details | Client Name / Location | Project Cost | roject Status | ||||
1 | Preparation of Concept Note / Preliminary Estimate (P-1) of Song DAM Water Supply Mega Project including Design, Collection of Data, Submission of Report & Drawing in Dehradun Nagar Nigam Area | Jal Nigam Dehradun , Uttarakhand | 441.31 Cr. Approx. | Complete | ||||
2 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Balrampur District Uttar Pradesh (Total Number of Village- 600 Nos.) | Dara Engineering & Infrastructures Private limited | 1200 cr Approx. | Under progress | ||||
3 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Sambhal District Uttar Pradesh (Total Number of Village- 118 Nos.) | NKG Infrastructure Limited | 240 cr Approx. | Under progress | ||||
4 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Gorakhpur District Uttar Pradesh (Total Number of Village- 100 Nos.) | NCC Ltd | 230 cr Approx. | Complete | ||||
5 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Pilibhit District Uttar Pradesh (Total Number of Village- 135 Nos.) | PNC Infratech Limited | 170 cr Approx. | Complete | ||||
6 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Kasgunj District Uttar Pradesh (Total Number of Village- 65 Nos.) | PNC Infratech Limited | 170 cr Approx. | Complete | ||||
7 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Barabanki District Uttar Pradesh (Total Number of Village- 55 Nos.) | PNC Infratech Limited | 140 cr Approx. | Under progress | ||||
8 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Bagpat, Ghaziabad & Gautam Budhh Nagar District Uttar Pradesh (Total Number of Village- 37 Nos.) | LC infra projects Pvt Ltd | 110 cr Approx. | Complete | ||||
9 | Preparation of Detail Project report, Topographical Survey & Hydraulic Design Network for Bijnor District Uttar Pradesh (Total Number of Village- 3 Nos.) | Vindhya Telelinks Ltd. | 7 cr Approx. | Complete | ||||
10 | Preparation of Hydraulic Design Network for Kasgunj District Uttar Pradesh Total Length of Distribution (Network- 120 km (Approx.) | Swastik Construction | 90 cr Approx. | Complete | ||||
11 | Hydraulic Modelling Design of Water Distribution network for Dehradun (23 Zones) , Dehradun City , Uttarakhand | Jal Nigam Dehradun , Uttarakhand | 250 Cr. Approx. | Complete | ||||
12 | Preparation of Detail Project Report (DPR) of District Nainital, Uttarakhand (SVS & MVS) Under Jal Jivan Mission (JJM) - 135 Nos. Villages & 90 DPR | Jal Sansthan, Naintal Uttarakhand | 2150 Cr. Approx. | Complete | ||||
13 | Preparation of Hydraulic Design of Pipe Line on Water Gems software for Water Supply Scheme , for Jaspur Town, Udham Singh Nagar, Uttarakhand. Under Externally Aided Projects (AEP) | Jal Nigam Rudrapur , Uttarakhand | 149 Cr. Approx. | Complete | ||||
14 | Preparation of Detail Project Report (DPR) of Chamiyala Pumping Water Supply Scheme, Block Bhilanga, District Tehri , Uttarakhand. Under Externally Aided Projects (AEP) | Jal Nigam Ghansali, Uttarakhand | 20.69 Cr. | Complete | ||||
15 | Preparation of Detail Project Report (DPR) of Syura Barsimi Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Jal Nigam Almora Uttarakhand | 7.41 Cr. | Complete | ||||
16 | Preparation of Detail Project Report (DPR) of Khatyari Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Jal Nigam Almora Uttarakhand | 22.76 Cr. | Complete | ||||
17 | Preparation of Detail Project Report (DPR) of Bhagtola -Sakar Rural Water Supply Scheme, Block Hawal Bagh, District Almora, Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Jal Nigam Almora Uttarakhand | 14.45 Cr. | Complete | ||||
18 | Project: Detailed Project Report of Single Villages Water Supply Scheme for Dehradun, Uttarakhand . Under Jal Jivan Mission (JJM) (Total Number of Village- 55) | Jal Sansthan Haridwar, Uttarakhand | per DPR Approx. 1 Cr. to 5 cr. | Complete | ||||
19 | Preparation of Detail Project Report (DPR) of Ghansali Pumping Water Supply Scheme, Block Bhilanga, District Tehri , Uttarakhand. Under Externally Aided Projects (AEP) | Jal Nigam Ghansali, Uttarakhand | 19.61 Cr. | Complete | ||||
20 | Preparation of Detail Project Report (DPR) of Chhoi Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 8.18 Cr. | Complete | ||||
21 | Preparation of Detail Project Report (DPR) of Chorpani Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 6.40 Cr. | Complete | ||||
22 | Preparation of Detail Project Report (DPR) of Bajunia Haldu Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 7.33 Cr. | Complete | ||||
23 | Preparation of Detail Project Report (DPR) of Dhikuli Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 3.49 Cr. | Complete | ||||
24 | Preparation of Detail Project Report (DPR) of Teda Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 1.96 Cr. | Complete | ||||
25 | Preparation of Detail Project Report (DPR) of Bagar Rural Water Supply Scheme, Block Ramnagar, District Nainital , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Nigam Ramnagar, Uttarakhand | 12.43 Cr. | Complete | ||||
26 | Preparation of Detail Project Report (DPR) of Mooldaspur Majra Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.85 Cr. | Complete | ||||
27 | Preparation of Detail Project Report (DPR) of Sarkadi Taharpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.47 Cr. | Complete | ||||
28 | Preparation of Detail Project Report (DPR) of Safarpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.19 Cr. | Complete | ||||
29 | Preparation of Detail Project Report (DPR) of Padliganda Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 4.44 Cr. | Complete | ||||
30 | Preparation of Detail Project Report (DPR) of Iqbalpur Kamelpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.39 Cr. | Complete | ||||
31 | Preparation of Detail Project Report (DPR) of Sohalpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.78 Cr. | Complete | ||||
32 | Preparation of Detail Project Report (DPR) of Rehmatpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 3.98 Cr. | Complete | ||||
33 | Preparation of Detail Project Report (DPR) of Akbarpur fazilpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.60 Cr. | Complete | ||||
34 | Preparation of Detail Project Report (DPR) of Gumma Wala & Mazari Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.80 Cr. | Complete | ||||
35 | Preparation of Detail Project Report (DPR) of Mehwar Kalan & Saidpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand (MVS) Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.51 Cr. | Complete | ||||
36 | Preparation of Detail Project Report (DPR) of Naubatpur Mulllewala Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 0.99 Cr. | Complete | ||||
37 | Preparation of Detail Project Report (DPR) of Dhandhedi Khwazipur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.49 Cr. | Complete | ||||
38 | Preparation of Detail Project Report (DPR) of Karaundi Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.60 Cr. | Complete | ||||
39 | Preparation of Detail Project Report (DPR) of Baswa Kheda Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.09 Cr. | Complete | ||||
40 | Preparation of Detail Project Report (DPR) of Bhagtowali Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 4.35 Cr. | Complete | ||||
41 | Preparation of Detail Project Report (DPR) of Aamkheri Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.88 Cr. | Complete | ||||
42 | Preparation of Detail Project Report (DPR) of Sikandarpur Rural Water Supply Scheme, Block Roorkee, District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.21 Cr. | Complete | ||||
43 | Preparation of Detail Project Report (DPR) of Bhowawali Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 3.43 Cr. | Complete | ||||
44 | Preparation of Detail Project Report (DPR) of Kahnewali Raisi Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 4.32 Cr. | Complete | ||||
45 | Preparation of Detail Project Report (DPR) of Maheshwara Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 3.45 Cr. | Complete | ||||
46 | Preparation of Detail Project Report (DPR) of Abdul Rahimpur Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.55 Cr. | Complete | ||||
47 | Preparation of Detail Project Report (DPR) of Bharuwala Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 3.21 Cr. | Complete | ||||
48 | Preparation of Detail Project Report (DPR) of Tanda Jalalpur Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.13 Cr. | Complete | ||||
49 | Preparation of Detail Project Report (DPR) of Balchandwala Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 2.59 Cr. | Complete | ||||
50 | Preparation of Detail Project Report (DPR) of Dallawala Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 4.27 Cr. | Complete | ||||
51 | Preparation of Detail Project Report (DPR) of Podowala Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.74 Cr. | Complete | ||||
52 | Preparation of Detail Project Report (DPR) of Joga wala Rural Water Supply Scheme, Block Khanpur District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 3.66 Cr. | Complete | ||||
53 | Preparation of Detail Project Report (DPR) of Boxowali Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Project Implementation Unit AMRUT (Roorkee), Uttarakhand | 1.43 Cr. | Complete | ||||
54 | Preparation of Detail Project Report (DPR) of Sultanpur Majri Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.89 Cr. | Complete | ||||
55 | Preparation of Detail Project Report (DPR) of Dudhaladayal wala Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 2.38 Cr. | Complete | ||||
56 | Preparation of Detail Project Report (DPR) of Kasampur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 2.44 Cr. | Complete | ||||
57 | Preparation of Detail Project Report (DPR) of Alawalpur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.05 Cr. | Complete | ||||
58 | Preparation of Detail Project Report (DPR) of Bhuwanpur Chamarwal Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.77 Cr. | Complete | ||||
59 | Preparation of Detail Project Report (DPR) of Meerpur Muwajpur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.59 Cr. | Complete | ||||
60 | Preparation of Detail Project Report (DPR) of Mohammadpur Kunhari Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.29 Cr. | Complete | ||||
61 | Preparation of Detail Project Report (DPR) of Nagla Khurd Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 4.17 Cr. | Complete | ||||
62 | Preparation of Detail Project Report (DPR) of Nalowala Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 1.57 Cr. | Complete | ||||
63 | Preparation of Detail Project Report (DPR) of Tikampur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 2.91 Cr. | Complete | ||||
64 | Preparation of Detail Project Report (DPR) of Sandhipur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Pey Jal Nigam Haridwar, Uttarakhand | 3.72 Cr. | Complete | ||||
65 | Preparation of Detail Project Report (DPR) of Shaympur Naurangabad Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.65 Cr. | Complete | ||||
66 | Preparation of Detail Project Report (DPR) of Tapdowali Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.43 Cr. | Complete | ||||
67 | Preparation of Detail Project Report (DPR) of Bulakganj Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 2.81 Cr. | Complete | ||||
68 | Preparation of Detail Project Report (DPR) of Ahamrpur Chidiyapur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.97 Cr. | Complete | ||||
69 | Preparation of Detail Project Report (DPR) of Gendi khata Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 4.39 Cr. | Complete | ||||
70 | Preparation of Detail Project Report (DPR) of Ladpur Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.92 Cr. | Complete | ||||
71 | Preparation of Detail Project Report (DPR) of Kangdi Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 4.41 Cr. | Complete | ||||
72 | Preparation of Detail Project Report (DPR) of Samaspur Katebad Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 2.39 Cr. | Complete | ||||
73 | Preparation of Detail Project Report (DPR) of Rasoolpur Katebad Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.11 Cr. | Complete | ||||
74 | Preparation of Detail Project Report (DPR) of Lal Dhang Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 4.62 Cr. | Complete | ||||
75 | Preparation of Detail Project Report (DPR) of Shayampur Nauabaad Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 3.21 Cr. | Complete | ||||
76 | Preparation of Detail Project Report (DPR) of Gajiwali Rural Water Supply Scheme, Block Bahadrabad District Haridwar , Uttarakhand Under Jal Jivan Mission (JJM) | Jal Sansthan Haridwar, Uttarakhand | 2.98 Cr. | Complete | ||||
77 | Hydraulic Modelling Design of Water Distribution network, RWSS Jorhat . Assam (Distribution Network- 1724km (Approx.) (Approval by World Bank & PHED Guwhati) | Gannon Dunkerley & Co. Ltd | 247 Cr. | Complete | ||||
78 | Topography , Contour Survey for OHT, CWR, & UGT Pump House Location for Water Supply scheme at Up Under UPJN Loni City, Ghazibad Uttar Pradesh Total Length of Distiribution Network- 400 km (Approx.) | Lahoty Buildcon limited | 177 Cr. | Under progress | ||||
79 | Hydraulic Modelling Design of Water Distribution network and Topographic Survey (Distribution Network- 850 km (Approx.). | Sn Envirotech Pvt Ltd | 144 Cr. | Complete | ||||
80 | Designing of Distribution and rising main for our running projects in Bandiya, Kicha distt- Udham Singh and Mehuwala cluster water supply project in Dehradun.( Network- 350 km Approx). | Tirupati Cement Products | 234 Cr. | Complete | ||||
81 | Topography , Contour Survey for WTP, Intake Well, OHT & UGT Pump House Location for Water Supply scheme at Up Under UPJN ,Mirzapur City,Uttar Pradesh Total Length of Distiribution Network- 220 km (Approx.) Total Length of Clear Water Rising Main- 18.3 km (Approx.) Total Length of Raw Water Rising Main- 2.5 km (Approx.) |
Gannon Dunkerley & Co. Ltd | 120 Cr. | Complete | ||||
82 | Project: Detailed Project Report of Single Villages Water Supply Scheme for Begusarai , Bihar . (Total Number of DPR- 25 ) | J.S INFRA & CONSTRUCTION CO. | per DPR Approx. 2 Cr. to 10cr. | Complete | ||||
83 | Project: Detailed Project Report of Single Villages Water Supply Scheme for Chhapra, Purnia, & Patna Districs , Bihar . (Total Number of DPR- 70 ) | TECHNO ENGICON SOLUTIONS PVT.LTD. | per DPR Approx. 2 Cr. to 10cr. | Complete | ||||
84 | Clear Water Rising Main Design for RWSS Scheme at Hailkandi, Assam ( Network- 47 km Approx). | Sn Envirotech Pvt Ltd | 144 Cr. | Complete | ||||
85 | Hydralic Design & Vetting (IIT Roorkee) for Distribution Network for Haldani Talli at Haldwani (Network- 30.6 km Approx). | Kashmiri Lal Constructions Private Limited | 5.4 Cr. | Complete |